Estimated reading time: 6 minutes
Last updated: — still nine eligible wards; no additional wards have opted in since the June 2025 vote.
On June 25, 2025, Toronto City Council voted to legalize six-unit homes as-of-right in nine of the city’s 25 wards — all of the former Toronto & East York district, plus Ward 23 (Scarborough North). Everywhere else in the city still caps out at four units for now.
Worth being precise about the name: this isn’t a “loophole” in the sense of an accidental gap someone found — it’s a deliberate, publicly voted zoning permission. If you own, or are shopping for, a lot inside these nine wards, you get as-of-right zoning for up to six self-contained suites, which means skipping two of the biggest timeline killers in low-rise development: a rezoning or Official Plan amendment, and most trips to the Committee of Adjustment for unit-count variances.
Which Wards Made the Cut?
- Ward 4 — Parkdale–High Park
- Ward 9 — Davenport
- Ward 10 — Spadina–Fort York
- Ward 11 — University–Rosedale
- Ward 12 — Toronto–St. Paul’s
- Ward 13 — Toronto Centre
- Ward 14 — Toronto–Danforth
- Ward 19 — Beaches–East York
- Ward 23 — Scarborough North, where the original pilot ran for two years before the citywide vote
The remaining 16 wards can still opt in through their own councillor — the door isn’t closed, it’s just not automatic.
Interactive Sixplex Eligibility Map
Type any Toronto address and get an instant check against the nine eligible wards, with a satellite view of the exact lot.
Micro-Geographies That Matter
Even inside a sixplex ward, exact location can still affect approval speed. Streets that straddle a ward border can flip from sixplex-eligible to fourplex-only on the opposite side of the street — Oakwood Avenue near the Davenport boundary is a good example of the kind of edge worth double-checking rather than assuming from neighbourhood name alone. Confirm the exact ward boundary for a specific address using the map above, or the City’s own interactive zoning maps, before you commit to a design.
How Long Does This Actually Take?
These are general estimates based on typical Toronto permit and Committee of Adjustment processes, not a guarantee for any specific property — actual timelines depend heavily on application completeness, the ward’s current workload, and whether variances are needed.
If you already own the lot and need no variances, you’re on the fastest path, largely governed by the City’s standard permit review streams — a 10-business-day target for a complete House Stream application, though real-world cycles including design work and any resubmissions commonly stretch into several months. Add a variance to that same lot and the timeline extends further: a Committee of Adjustment cycle typically runs 3–4 months once you factor in the 60-day hearing target, notice periods, and a 20-day appeal window, followed by a revised permit cycle. And if you’re still shopping for a property, tack on another 2–4 months for search and negotiation plus a 60–90 day closing before either of those scenarios even starts.
Bundle all of that together and a project that needs variances and starts from a property search can realistically run well over a year end-to-end. Confirm current Committee of Adjustment wait times directly with the City before building these numbers into your own project plan — they’re a starting point for expectations, not a commitment from anyone.
Why the Nine-Ward Zoning “Leaps Ahead” of the Usual Fight
Outside these nine wards, anything above four units still triggers Committee of Adjustment review or a full rezoning application, which gives neighbours multiple points at which to object — and each one adds delay whether or not the objection ultimately succeeds. Inside the nine wards, that fight mostly disappears, because the zoning already says six units are allowed.
That wasn’t an accident of timing. Ottawa’s Housing Accelerator Fund ties federal money to faster municipal approvals, and the nine-ward vote itself was driven partly by roughly $30 million in funding the City risked losing if council hadn’t acted. It also helped that the argument “sixplexes don’t fit here” is harder to sustain in neighbourhoods that already contain century-old triplexes and walk-ups — precedent density that downtown and East York have had for decades. And because Ward 23’s pilot ran for two years before the citywide vote, city inspectors and reviewers had already worked through the practical kinks, which should smooth the process across the other eight wards too.
Strategy Tips for Owners and Buyers
Pull the zoning certificate early — it confirms you’re actually inside the sixplex zone and flags any surprise overlays, like a ravine, natural feature, or floodplain designation, before you’ve sunk money into a design that doesn’t work on the lot. If you do need to visit the Committee of Adjustment, bundle every issue into one comprehensive application rather than filing separately for each variance; two separate trips can add months for no real benefit. Transit-linked lots are generally worth prioritizing too, since they tend to come with parking waivers and stronger policy support behind them.
Heritage due diligence is easy to skip and expensive to regret: check the Heritage Register before you plan a teardown, since removing a house on the list — even one that isn’t formally designated — can trigger its own review period. And it’s still worth talking to neighbours early, even though objections carry less weight when the zoning already allows six units outright; a conciliatory design choice, like retaining a front yard tree or keeping a pitched roofline, can head off friction if a variance ends up being necessary after all.
The Bottom Line
The nine-ward sixplex zone is currently the fastest legal path to a six-unit rental in Toronto. Stay inside the boundaries, file a complete permit set, and you can realistically break ground months — sometimes years — sooner than a comparable lot elsewhere in the city.
“Confirm the exact ward boundary for your address before you plan a design — the difference between sixplex-eligible and fourplex-only can be which side of the street you’re on.”
Need a ward check and realistic timeline for your exact address, or help short-listing purchase targets? Book a complimentary 15-minute discovery call and get a custom report on zoning status, variance risk, and projected rents.
Frequently Asked Questions
→ Which Toronto wards allow sixplexes as-of-right?
Nine wards, following Toronto City Council’s June 25, 2025 vote: Ward 4 (Parkdale–High Park), Ward 9 (Davenport), Ward 10 (Spadina–Fort York), Ward 11 (University–Rosedale), Ward 12 (Toronto–St. Paul’s), Ward 13 (Toronto Centre), Ward 14 (Toronto–Danforth), Ward 19 (Beaches–East York), and Ward 23 (Scarborough North). The remaining 16 wards can opt in individually through their councillor.
→ Is the “sixplex loophole” actually a loophole?
No — it’s a deliberately voted, publicly documented zoning permission, not an unintended gap in the rules. Toronto City Council explicitly approved as-of-right sixplex zoning in these nine wards through a recorded vote in June 2025, partly under pressure to meet federal Housing Accelerator Fund commitments.
→ How long does it take to build a sixplex in one of the nine eligible wards?
If you already own the lot and need no variances, the process is largely governed by the City’s standard permit review timelines, though real-world cycles including design and any resubmissions commonly run several months. Adding Committee of Adjustment variances or starting from a property search extends the realistic timeline well beyond a year in many cases — confirm current wait times directly with the City rather than relying on general estimates for project planning.
Related: Build a Sixplex in Toronto: Guide · Multiplex Project Blind Spots · Will Sixplexes Hurt Neighbouring Property Values?